اصفهان، شمس آبادی، چهار راه قصر، ساختمان شمس، واحد 108
03132207923 & 03132231800

رزومه انگلیسی

COMPANY PROFILE

          Imen Parto was found in 1993 with the permission of Iranian Atomic Energy Organization. We are Submitting a full range of Nondestructive Tests (NDT) including: MT, PT, UT, RT, RTI, VT, Thickness Gauging, Hardness Testing, Vacuum Testing Which are perform by Especialist and experienced staff. Hear is some of our activities during these years.

 

Industrial

Gas Distribution Network`s Radiography

  • Hafshejan gas distribution network (phase 1) 1994
  • Ben & Saman gas distribution network 1995
  • Semirom gas distribution network 1996
  • Isfahan Different gas distribution networks 1996
  • Rezvanshahr gas distribution network 1996
  • Fereydoonshahr gas distribution network 1996
  • Bijar gas distribution network 1996
  • Ghal`e Amirieh gas distribution network 1996
  • Kelishad gas distribution network 1996

 

Gas Pipeline`s Radiography

  • Ghazvin-alamoot & sar`ein-khalkhal gas Pipeline 2010-2015
  • 8th Parsian gas Pipeline 2005-2008
  • 12˝ Borkhar & Dastgerd gas Pipeline 1993
  • Semirom/Abadeh/Eghlid gas Pipeline 2005-2008
  • 3rd Isfahan Refinery gas Pipeline 2005-2008
  • Bijar to Dehgolan gas Pipeline 1996-1997
  • Harand to Varzaneh gas Pipeline 1996
  • Fereydoonshahr gas Pipeline 1996
  • Malayer to Sahneh gas Pipeline 2001
  • Kashmar to Bardscan gas Pipeline 2000
  • Lordegan gas Pipeline 1996
  • Abadeh Ring 1998
  • Yazd Ring 1997
  • Safashahr to Abadeh 56˝ gas Pipeline 2004
  • Parsian to Jahrom 8th gas Pipeline (56˝) 2005-2008
  • Pataveh to Babameydan 56˝ gas Pipeline 2007

 

Water Pipeline`s Radiography

  • Golab tunnel water pipeline 2014-now
  • Zayandehrood to Kashan Water Pipeline 2005-2008
  • Kohrang to Shahrekord Water Pipelien 2006-2009
  • Cheshmeh Langan to Fereydoonshahr Water Pipeline 2007
  • Kohrang to Cheshmeh Morvarid 3rd tunnel Water Pipeline 2008
  • Heyduj Water Pipeline 2008
  • Koochary Dam to Qom Water Pipeline 2008 to 2012

Industrial NDT

  • NDT in Bafgh Zinc & Casting 1999
  • Yazd Thermal Powerplant 1999
  • Yazd Alloyed Steel 1999
  • Gachsaran NGL 1200 2000-2002
  • Isfahan New Acrylic`s NDT 1999
  • Isfahan LAB Storage tanks & Pipings 2002
  • Isfahan Strategic Storage Tank 2002
  • Qazvin Strategic Storage Tank 2004
  • Developing Project of Sarcheshmeh Copper 2000
  • Developing Project of Jam Refinery 1999-2006
  • Mobarakeh Steel Acid Washing unit 2004 (Joined with NY co.)
  • Isfahan Iron Melting (zob Ahan)Oxygen unit 2003-2004
  • Shahid kharrazi Reduction Plant (IRITEC) construction : (TAMKAR & ASA GROUP & SADAD SANAT CO.) & Installation : (KAVIR & PAMICO) 2010-till now
  • IOEC Bollards & Frames for Phase 15 & 16 of South Pars Gas Field Development Phase 15,16,17 & 18 – 2011
  • Akhgar Steel Co. Pipe & Casting Products
  • NDT of Products  of  Isfahan Boiler, Niroo noiler, Ansar, Super action, Sepahan Bokhar , Alfasam, Isfahan Kafriz, Tamkar, Petrokav Arian, Sadad San`at, Kaloop, Iran Spiral, Fakoor Meghnatis Espadana, Asagroup, Telfer , . . .

Overhalls

  • Overhall of bandarabbas Refinery 2004
  • Overhall of Isfahan Elecrtical Powerplant 2007
  • Overhall of Niroocolour 2009
  • Overhall of Sepahan Oil 2008
  • Overhall of Isfahan Refinery 2007
  • Isfahan Refinery`s Radiography 2003
arta

 

Personnel and Equipments

Number Equipment
6 Radiographic Camera
5 Radiographic Source
1 X-Ray Tube
3 Ultrasonic
4 Magnetic Yoke
12 Ultrasonic Thickness measurment
1 Portable Hardness
1 Vacuum Test Equipment
5 set VT Equipments
9 set RTI Equipments
5 group Radiographic health  Protection Equ.
60 set MT Materials (bycotest&magnaflux)
60 set PT Materials (bycotest&magnaflux)
ISO, ASME, AWS, DIN, API, ANSI, ASTM, AWWA Standards Complete Texts